Our new catalogue is out now! Click here to download or view online

School Classroom Furniture Experts Since 1929

INC VAT
Over 90 Years of Expertise
Quality Products & Service
Price Match Promise
Instant 30 Day Credit
Menu

Parkgate Primary School

Parkgate Primary School is one of the largest primary schools in the city of Coventry and an academy within The Futures Trust.

How we helped Parkgate Primary School

Parkgate Primary School is one of the largest primary schools in the city of Coventry and an academy within The Futures Trust.

Project Scope

Design proposal, supply and installation of a new Foundation Stage outdoor play area.

Our brief

Parkgate Primary School’s Foundation Stage outdoor play area had suffered during the heatwave of 2018, killing off their grassed area and taking it back to just soil.

Morleys were invited to create an outdoor play area that had all year-round use, with play zones connected by an all-weather pathway.

How we delivered

All areas of dead grass removed, and areas zoned with either artificial grass, loose-fill woodchip or shock pad safety surface

Locker style storage unit added which housed a modular, free-standing activity trail that can be packed away and the area used for a variety of other things

Triple-ply polycarbonate canopy shelter fitted that offers essential UV protection during outdoor learning.

Old equipment removed and replaced, rotten sandpit removed and replaced with a new large sandpit with sliding lid, metal climbing frame removed and replaced with an Esmerelda Tower Working garden area was created using two planters at children’s working height

A gazebo with seating to all sides was built around a tree to make a storytelling and role play area.

How we delivered

All areas of dead grass removed, and areas zoned with either artificial grass, loose-fill woodchip or shock pad safety surface

Locker style storage unit added which housed a modular, free-standing activity trail that can be packed away and the area used for a variety of other things

Triple-ply polycarbonate canopy shelter fitted that offers essential UV protection during outdoor learning.

Old equipment removed and replaced, rotten sandpit removed and replaced with a new large sandpit with sliding lid, metal climbing frame removed and replaced with an Esmerelda Tower Working garden area was created using two planters at children’s working height

A gazebo with seating to all sides was built around a tree to make a storytelling and role play area.

Call our furniture consultants to discuss your requirements

Next case study

Next case study Crofton School

Previous case study